Steel Pipe Rack Bridge Construction
Year
2021-2022
Duration
1 year
Client
Motor Oil

Project Overview
About the Project
The project included the construction of a steel pipe rack bridge for pipeline crossing in the tunnel area, north of Unit U-1100. Works covered fabrication, installation, and structural integration, focusing on load-bearing capacity, safety, and compatibility with existing facilities.
Completion Year
2021-2022
Client
Motor Oil
Duration
1 year
Next Project

New PIPERACK Piping Works – North U-1100
Prefabrication and installation of new piping systems for the rerouting of the main PIPERACK at Unit U-1100, meeting strict industrial safety standards.
